Marina Club Apartments

Location
St. Petersburg, FL
Year Completed
2024
Sq. Ft.
400,000
Units
400
Stalls
700
Team Collaboration
  • Owner/Developer:
  • Allied Group Holdings
  • Architect:
  • Architectonics Studio
  • General Contractor:
  • Skanska USA
  • Precast Manufacturer:
  • Dura-Stress Inc.
  • Precast Specialty Engineer:
  • ERA Structural Engineering
  • Structural Engineer:
  • ERA Structural Engineering
Structural Systems
  • Precast Plank Floors
  • ER-POST
  • Precast, Prestressed, Concrete Trusses at Every-Other Level