The structure is near completion. All but the two final trusses are in place, and the precast plank will soon establish the two top floors. The erection is fast and simple, and with all precast elements – columns, trusses and plank the on site work is minimized. With this building elevation you can visualize the amount of open space on all floors, allowing for large flexible space planning.